Work on HVAC infrastructure systems continues as planned and is on time. Planning and analysis of the replacement of the new raised floor is complete. The install of the new floor is to be completed over the next month. This includes the closing of large holes in the floor, leveling out the floor, sealing the floor, and the installation of the raised floor system and tiles. While this is being done work will continue on the HVAC infrastructure systems.
The new Help Desk area construction is nearing completion and awaiting the arrival of the furniture.